Stressing equipment

  • Stressing equipment

We develop and construct the entire pre-stressing system to customers' specific requirements. Abutments are fitted at each end of the production bed. Reinforced concrete abutments are provided by the customer on site. Various types of pump assemblies and systems can be used to stretch the strands or wires. Jack size is matched to the cross-section of the reinforcing strands or wires.